1 · Paint — gallons
Formula: (area − openings) × coats ÷ coverage. Porous walls use 300.
2 · Tile — boxes
3 · Concrete — 60/80-lb bags
Volume ft³ = L×W×(D/12). 80-lb ≈0.6 ft³, 60-lb ≈0.45 ft³. +5% waste.
4 · Mulch — cubic yards
5 · Wallpaper — rolls
Drops = ceil(width ÷ rollWidth). Each drop wastes one repeat. +10% trim.
6 · Fence — pickets, rails, posts, concrete
7 · Laminate — packs
8 · Drywall — 4×8 sheets
Sheet = 32 sqft. Add 10% cuts.
9 · Deck — boards
10 · Raised-bed soil — cubic yards
yd³ = L×W×(D/12) ÷ 27. 8×4×1 ft = 1.19 yd³.
11 · Heater BTU + running cost
BTU = sqft × factor. Mini-splits: 9k/12k/18k/24k BTU
Guides
Methodology
Generic rates, adjustable. Paint 350 sqft/gal; tile/flooring/wallpaper +10%; concrete 0.6/0.45 ft³ per 80/60-lb bag +5%; fence posts every 8 ft, 2–3 bags 50-lb per post. Verify with product label. Keywords: how many gallons / bags / rolls / pickets do I need.